Recent & Current Fire Protection Projects from Kauffman Co.

League City Public Safety Building

Location: League City, TX

Project Timeline: September 2013 - Ongoing

Installation of fire sprinkler system in multi-level building including specially designed holding cells

southmayd elementary campers logo fire protection from kauffman co

Southmayd Elementary

Location: Houston, TX

Project Timeline: March 2013 - April 2014

Installation of fire sprinklers in two new wings of school, including interconnection of systems through the existing school

marriott hotels resorts and suites red logo fire protection from kauffman co

Waterway Square Hotel

Location: The Woodlands, TX

Project Timeline: April 2014 – Ongoing

New fire sprinkler systems for new 12-story high rise hotel with conference and meeting centers throughout the first two levels. Fire pump and standpipe system and tie into existing convention center.

hampton by hilton hotel fire protection from kauffman co

Hampton / Homewood

Location: Houston, TX

Project Timeline: Ongoing

Design of fire standpipe drawings for permit set as part of pre-construction service; design and install of new sprinkler systems for dual tenant high rise hotels, including fire pump and standpipe system

ifly skydiving fire protection fron kauffman co

Ifly Bunker Hill

Location: Houston, TX

Project Timeline: Ongoing

Design of fire sprinkler, standpipe, fire tank, fire pump for new indoor skydiving facility; custom designs for an entirely unique building.

First United Methodist Church Downtown

Location: Houston, TX

Project Timeline: November 2012- November 2013

Retrofit sprinkler system in historic downtown building, replace existing fire pump, and got variances from COH

Get started Request A Quote Today

Request Service

img5
img6
img7
img8